How to move base point in revit?

Contents

How do you select a project base point in Revit?

1. Open the desired view.

2. Click View tab Graphics panel (Visibility/Graphics).

3. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site, and expand it.

4. To display the project base point, select Project Base Point.

5. To display the survey point, select Survey Point.

How do you unclip a project base point in Revit 2021?

To move/relocate the project, go to the Manage tab -> Project Location panel -> Position dropdown -> Relocate Project. This is in essence the Move command and allows you to move the project to the correct coordinate location.29 mai 2020

How do I relocate an elevation in Revit?

1. Open an “elevation view” (north, east or any of that, even a section)

2. Go to “Manage”

3. at the “Project Location” on manage click on “Position” tab and choose “Relocate Project”

How do you set a project base point and survey point in Revit?

Use the project base point and the survey point to provide context for the model. The project base point defines the origin (0,0,0) of the project coordinate system. Use the project base point as a reference point for measurements across the site.7 mai 2020

How do you move a project base point in Revit without moving a building?

1. In the site plan view or another view that displays the project base point, select the project base point.

2. Drag the project base point to the desired location.

INTERESTING:   How to switch from 3d to 2d in revit?

3. Optional: To ensure that the project base point does not move inadvertently, pin it in place by clicking Modify tab Modify panel (Pin).

What is Project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. … When you first create a Revit model, the project base point is located at the internal origin. When starting a project, decide where in the model the project base point will be placed.22 juil. 2021

What are the 3 points in Revit?

There are 3 different origin points in a Revit project: the Project Base Point, the Survey Point and the secret Internal Origin.6 jui. 2018

How do you hide a project base point in Revit?

To temporarily display the project base point and the survey point in a view, on the View Control Bar click (Reveal Hidden Elements).7 mai 2020

What is the method to georeference a Revit file?

Revit 2018 now has the option to use the Geo-Referenced data from a CAD file that was used to Acquire Coordinate data. When you link and position a Geo-Referenced CAD file, you use the Acquire Coordinates feature in Revit to share coordinate system data between the Revit and CAD file.12 déc. 2017

How do I move an entire project in Revit?

1. Click Manage tab Project Location panel Position drop-down (Relocate Project). You use the tool just like the Move tool.

2. Move the project graphically in the view.. Note: If you have set levels or spot elevations to report values from the shared origin, their values update.

INTERESTING:   How to open sample project in revit?

How do I move multiple levels in Revit?

To move the selected level up or down, click the temporary dimension, type a new value, and press ENTER . Drag the selected level line up or down. To move multiple level lines, select the desired number of level lines and move them up or down.7 mai 2020

How do you change level in Revit without moving model?

What is survey base point?

The survey point represents a known point in the physical world, such as a geodetic survey marker. The survey point is used to correctly orient the building geometry in another coordinate system, such as the coordinate system used in a civil engineering application.

What is a project point?

A project point cloud presents the project’s scan data in an optimized spatial structure for fast visualization of large amounts of scan points. Scan points are loaded and visualized on demand based on the camera position and point visibility, allowing users to view all scans of a scan project at once.2 juil. 2018

What is survey point Revit?

The survey point provides a real-world context for the Revit model. It represents a known point in the physical world, such as a geodetic survey marker or the intersection of 2 property lines. … In a Revit model, the survey point defines a reference point for the survey coordinate system.21 jan. 2021